Construction process

0 123456789

First contact

In-depth knowledge of the size and characteristics of your land is essential to begin the construction process.
The first meeting with our technical team is crucial to define your needs and evaluate the technical and economic feasibility of the project together.
Knowing your available budget is essential in order to offer you a sustainable proposal.
Based on the information provided, we can proceed with the preliminary design, offering you the choice between a model home or a customised project.
If you already have a project, simply send it to us along with all the information necessary to prepare a quote.

Estimate

Pozzicase is committed to preparing a precise and detailed quotation, including a comprehensive bill of quantities.
This process concludes with the presentation of a written offer outlining the solutions adopted for the specific project, including insulation, systems, and finishing materials.
The accuracy with which we prepare the quotation ensures fixed costs, providing you with a clear and transparent overview of the budget required for your home.

Building permits

A licensed technician handles the application for the building permit with the competent municipality.
The time required for the permit to be issued may vary depending on local planning restrictions and the specific procedures of the municipality.
At the end of the process, the client is required to pay the applicable building charges (or urbanization fees) set by the local authority.

Choice of materials

Through a series of dedicated meetings, we work with you to define the details of the specifications, including facades, windows and doors, shading systems, roofing, flooring, bathroom fixtures and all other interior finishes.
Once the decisions have been made, we place orders for all the materials needed to build your home.
We are committed to providing high-quality materials, carefully selected to ensure durability, functionality and aesthetic appeal.

Excavation and Foundations

The excavation and construction of reinforced concrete foundations is essential to ensure the stability and anchoring of the prefabricated house.
The time required for completion depends on whether you choose to build a basement, a simple slab foundation or a ventilated crawl space.
The work is carried out according to precise instructions regarding the dimensions and preparations necessary for the passage of the systems.

Assembly of wooden structures

The prefabricated elements are transported to the construction site and assembled mechanically using metal joints.
Thanks to the use of pre-cut construction elements, assembly can be completed in just a few days.
This rapid and efficient approach significantly reduces construction time while ensuring the precision and quality of the final result.

Systems and insulation

After completing the roof covering of the building, the electrical and plumbing systems and the windows and doors are installed.
At the same time or subsequently, the insulating layers are laid on the walls.
At this stage, particular attention is paid to the cladding of the facades, both internal and external, to give the building a high-quality aesthetic appearance.
In addition, solar shading is installed to ensure adequate light and heat control.
This stage of the work completes the building envelope, preparing it for the subsequent stages of finishing and customisation of the interiors.

Interior finishes

To ensure maximum attention and concentration on the part of every craftsman involved in installing the finishes, a careful timeline of the work is drawn up to avoid overlaps and inconsistencies.
Pozzicase technicians offer constant support and monitoring to every operator involved in the construction process, both during the installation of interior and exterior finishes.
This careful supervision guarantees high-quality results and smooth coordination between the various professionals, ensuring that the project develops in line with the planned schedule and the customer’s expectations.

Underground utilities and external works

The connection and external works complete the construction phase of the house, ensuring connection to the service networks and adaptation of the external spaces.
Pozzicase takes care of connecting properties to the electricity, water and sewerage networks, ensuring that the systems function correctly.
In addition, external works such as paths, car parks, fences and gates are also carried out.
This final phase of the project ensures that the house is ready to be inhabited and fully enjoyed by its owners.

 

6

months for construction

15

technical professionals

41

construction site workers

4257

working hours

House assembly

One advantage of the prefabricated timber system is the speed with which the structures can be assembled.
Each timber element is pre-cut in the factory using numerically controlled machinery and identified with a code.